Building Frame and setting up the bulkheads
Building Frame
The timber building frame was secured to the floor during the planking stage. Later large castors were fitted so it could be rolled out of the workshop.
September 2008
Setting the frames
The bulkheads are set on temporary legs and clamped to avoid damaging the frames that will be seen inside the boat.